Nigeria’s 26 Power Plants’ Capacity Drops By 70%

0 246

There has been a drop in the combined generation capacity of Nigeria’s 26 power plants by 70%.

A breakdown of the data showed that the four hydro plants under the Power Purchase such as Kainji plant (hydro); with an original 760MW capacity, had approximately 153MW capacity as of July 2021, while Jebba with 576MW capacity, had 332MW.

Shiroro plant with a nameplate capacity of 600MW already dropped to 248MW. While Mabon with 40MW capacity did not generate any power as of the last review date.

The gas plants under the Power Plant Agreement such as Egbin, went from 1100MW to 606MW; Sapele from 1020MW to 46MW, Delta from 900MW to 281MW. AfamIV-V production capacity went from 776MW to 67MW, and Geregu capacity dropped from 414MW to 277MW.
Azura’s capacity also went from 450MW to 421MW, Agip dropped from 465MW to 29MW. Shell from 650MW to 287MW, Olorunsogo from 304MW to 195MW, and Omotosho also dropped from 304MW to 254MMW.

The last batch of eight gas plants under the National Integrated Power Project such as Geregu, Sapele Alaoji, Olorunsogo, Omotosho, Ihovbor, Calabar; and Gbarain nameplate capacities formerly at 434MW, 450MW, 960MW, 675MW, 500MW, 450MW, 563MW, and 225MW respectively; witnessed a crash in capacities to 77MW, 33MW, 58MW, 23MW, 43MW, 17MW, and 236MW respectively.

The government-owned gas plants still under the PPA such as Ibom Power, OmokuFIPL, Trans Amadi FIPL, and Afam FIPL, generation capacities went from 190MW, 150MW, 130MW, 360MW with Eleme not generating into the grid, to 13MW, 31MW, 76MW, and 65MW respectively.
Total capacity of all the plants which was put at 13,461mw at the beginning; dropped to a low of 4,022MW as of July 2021.

The country’s power generation had, as of last month, crashed to an all-time low of 9MW per day.

-Punch.

Leave A Reply

Your email address will not be published.